- Miss Joker suit and blouse - DONE (decided not to make shoe clips at this time)
- Tour Wear
- Cream leggings are DONE!
- "Wilde Side" leggings are cut out and pinned for the first seam
- 'I believe in pink' tunic is started and has already had a fitting
- "Eat, drink and be scary" Halloween tunic is still ready for
construction, but I have the zipper and have cut out the lining.
- The embroidered quilt for my nephew is DONE and headed back to my cousin for quilting.
- Didn't work on my embroidered quilt
- Halloween skirt - Still need to finish the waistband.
- Christmas nightgown is ready for construction.
- Keeper of the Keys waist cincher- Decided that I need this by November 1 for an Archon event. This also means that I need to fix my Keeper of the Keys skirt...-
- Quilt blocks are still waiting for me to start my Ohio Star blocks.
- And I cut out 32 four and a half inch blocks for my charm quilt.
My weekend were:
- At least get the "Wilde Side" leggings cut out if not started. - check
- And work on one or both of my tunics. - sorta check
- Maybe work on my embroidery. - definite check since I finished the baby quilt
What I'd like to do this week:
- Finish one tunic, probably "I believe in pink"
- Get the "Wilde Side" leggings done which should be a quick project
- Work on my embroidered quilt. The Archon is having a build day this weekend, this will likely go with me.
- Hmmmm maybe I should get the waist cincher ready for boning then I could work on it at the build day...
No comments:
Post a Comment